DATE:
AUTHOR:
The Cotality Mercury Network team

New Release Management Tool and Updated UAT/Production Maintenance Windows

DATE:
AUTHOR: The Cotality Mercury Network team

Mercury Network is rolling out a new release management tool to streamline and standardize its deployment process, effective with the UAT release beginning August 19, 2025.

Key Benefits

  • Improved deployment reliability and consistency

  • Faster release cycles through automation

  • Enhanced visibility and traceability of release pipelines

  • Reduced manual errors for higher-quality releases

Deployment Schedule

UAT Releases

  • Window: 8:00–10:00 a.m. CST, with up to 2 hours of expected downtime

  • Action required: save work, exit the system, and pause UAT activity

Production Releases

  • Window: 7:00 p.m.–12:00 a.m. CST, with up to 5 hours of expected downtime

  • Action required: save work, exit the system, and pause traffic

  • Maintenance may occasionally extend beyond midnight due to unforeseen circumstances

Daily UAT Builds

  • Window: 11:00 a.m.–12:00 p.m. CST

  • The system remains accessible, though intermittent disruptions are possible

  • Supports continuous development of Encompass Partner Connect (EPC) functionality

Related: Product Release Notifications Subscription

Powered by LaunchNotes